Abstract
A pilot plant with a capacity of 20 similar to 30m(3)/day was operated for 10 months for simultaneous removal of nitrogen and phosphorus by a modified Phostrip process. in the process, a denitrification tank was installed before the aeration tank in the Phostrip process, which was developed mainly for phosphorus removal. To maintain the effluent TKN concentration in the range of 1 similar to3 mg/L, the allowable maximum TKN loading rate in the aeration tank was found to be 0.065 kg TKN/kg MLSS.d. The nitrification rate in the aeration tank increased as the influent COD/TKN ratio declined. The optimal internal recycle rate from the aeration tank to the denitrifier was found to be 2Q when the yearly average COD and TKN concentration of the influent was 197 mg/L and 37.1 mg/L, respectively. To keep the effluent T-P concentration below 1 mg/L, T-P loading to the aeration tank should be less than 0.008 kg T-P/kg MLSS.d at the sludge recycle rate of 0.3Q from the 2nd clarifier to P-stripper. However, the loading should be kept at less than 0.0065 kg T-P/kg MLSS.d at the sludge recycle rate of 0.15Q.
Author(s)
Kim, KSCho, KMChoi, HeechulKim, In S.
Issued Date
2000-01
Type
Article
DOI
10.2166/wst.2000.0380
URI
https://scholar.gist.ac.kr/handle/local/18641
Publisher
International Water Association Publishing
Citation
Water Science and Technology, v.42, no.3-4, pp.199 - 204
ISSN
0273-1223
Appears in Collections:
Department of Environment and Energy Engineering > 1. Journal Articles
공개 및 라이선스
  • 공개 구분공개
파일 목록
  • 관련 파일이 존재하지 않습니다.

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.