OAK

Feasibility study on tri-hybrid desalination system

Metadata Downloads
Author(s)
Jung, Hyung HoLee, Woo HyungKim, Joon Ha
Type
Article
Citation
Desalination and Water Treatment, v.15, no.1-3, pp.35 - 42
Issued Date
2010-03
Abstract
In the present study, the feasibility of a tri-hybrid desalination system for the production of electricity, energy for heating and cooling and water was studied. The tri-hybrid desalination system is a combination of a cogeneration and a desalination system. The system is composed of a generator driven by a gas engine, a gas boiler, a turbo-refrigerator, an absorption refrigerator for cogeneration, and an RO and an MED for the desalination system. The excess heat was calculated based on the electrical, heating and cooling load data and assumed that would be used for the production of water. The quantitative analysis of the product water and the energy consumption rate was compared on a month-by-month basis, and the feasibility of the tri-hybrid desalination system is explained.
Publisher
Taylor & Francis
ISSN
1944-3994
DOI
10.5004/dwt.2010.1664
URI
https://scholar.gist.ac.kr/handle/local/16807
공개 및 라이선스
  • 공개 구분공개
파일 목록
  • 관련 파일이 존재하지 않습니다.

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.