Total annual profits estimation for new construction of an SWRO desalination plant in Korea
- Abstract
- A seawater reverse osmosis (SWRO) desalination process has become an alternative technology to solve water shortage problem in the world. Although SWRO is an advanced and useful technology for humanity, there is still unsettled cost effective issue. Therefore, the estimation of operation and maintenance (O&M) costs should be significantly considered before a new construction of SWRO desalination plant. The objective of this feasibility study is to estimate total annual profits (TAP) according to O&M for a new construction of SWRO desalination plant at 9 candidate sites along the shoreline in Korea. The cost estimation model was developed and validated with Fujairah SWRO plant operation data in 2005. As a result, TAPs for the 9 candidate sites were estimated and compared with that of Fujairah SWRO plant. The result reflects that the cost estimation model in this study is able to propose a reasonable range of TAP for a new construction project of SWRO desalination plant in Korea.
- Author(s)
- Jung, Da Hee; Lee, Young Geun; Lee, Yun Seok; Kim, Joon Ha
- Issued Date
- 2010-03
- Type
- Article
- DOI
- 10.5004/dwt.2010.1673
- URI
- https://scholar.gist.ac.kr/handle/local/16802
- 공개 및 라이선스
-
- 파일 목록
-
Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.